2023-07-09 18:18
Here’s a southbound SMART train crossing the Haystack Bridge near Downtown Petaluma. With several passing loops along the line, SMART should aim to run at least hourly service off peaks daily (not having two-hour gaps) so that it can properly compete against Golden Gate Transit, Marin Transit, and Sonoma County Transit. What do you think?
回覆
轉發

回覆

轉發

24小時粉絲增長

無資料

互動率

(讚 + 回覆 + 轉發) / 粉絲數
0.00%

回覆 (BETA)

最先回覆的內容
發文後用戶內容

© 2025 Threadser.net. 版權所有。

Threadser.net 與 Meta Platforms, Inc. 無關,未經其認可、贊助或特別批准。

Threadser.net 也不與 Meta 的"Threads" 產品存在任何關聯。