2025-01-25 01:31
The process of our ready to wear it’s not a month thing, it’s a full 3-4 months of sample of draping, selecting materials. I will always insist the softest lightest chiffon as close to chiffon silk which we use for luxe. Lining needs to be exact if not as close as 85%. Soft satin is a must. Some colours we even dye the lining. Another 2 months of going through factory samples to follow our samples. They need to emulate the exact folds, drapes and print placing.